| · Nylon & Polyester Chip Dryer |
 |
| · To remove moisture, volatile Mediums other than moisture, like Organic vapor and Etc. |
 |
· Synthetic resin contain Moisture & Organic vapors
· Thread cut or Silver mark during thread ejection
· To avoid these problems, The synthetic resin should be dried before ejection
· When dry the product in Atmosphere, The products color and quality can be changed So,
We use Vacuum dry process |
|
|
|
 |
| · Fatty Acid Distillation |
 |
· To remove Free Fatty Acid and moisture.
· The process is consist of following 4 parts;
- Free Heat and Dehydration
- Thermo Boiler
- Condensing
- Vacuum unit
|
 |
· Reduce very much utility cost (steam, water)
· Eliminate Waste Water treatment process
· Low operation cost
· Simple and stable Vacuum system
· Shorten process cycle
· Maximize product quality
· Small installation space & cost
· Production cost reduction with above advantages
|
|
|
|
 |
| · Edible Oil Distillation |
 |
· Deoxidation, Deodorization and to remove Free Fatty Acid and Etc.
|
 |
· Reduce very much utility cost (steam, water)
· Eliminate Waste Water treatment process
· Low operation cost
· Simple and stable Vacuum system
· Shorten process cycle
· Maximize product quality
· Small installation space & cost
· Production cost reduction with above advantages
|
|
|
|
 |
·Degassing : PVC, Sealant, Epoxy resin & Etc.
·Steel Degassing
|
 |
· To remove air bubble or water vapor from low material
· To remove Hydrogen, Inorganic oxides from steel
|
 |
· Require large installation spaces
· Require large amount of water for sealing
· All sealing water become waste water
· Waste water treatment problem
· Require a lot of utility cost(Sealing water & WWT)
· Big water pollution problem
|
|
|
|
 |
·Solvent Recovery
·DMAC, DMF, HC, Surfactant, Resin
|
 |
· Recover Organic vapors from final product
|
 |
· Solvent recovery after PS reaction
· Solvent recovery after Epoxy resin manufacturing
· Solvent recovery after production of Surfactant
· Solvent and residue removal after ABS reaction |
|
|
|
 |
·Plastics resin Compounding
·ABS, EP, SAN, PMMA & Etc.
|
 |
· Remove moisture, gas, and resin residue from Extruder of Synthetic Resin Plant
|
 |
· Require large amount of water for sealing
· All sealing water become waste water
· Waste water treatment problem
· Require a lot of utility cost (Sealing water & WWT)
· Big water pollution problem |
|
|
|
 |
·Vacuum Dry in Medicine industry
|
 |
· Evaporate and Remove Solvent -Methylene Chloride, Ethanol & Etc.
|
 |
· Save a lot of Utility cost (CW, Oil & Etc.)
· Eliminate Waste water & oil treatment Problem
· Low operation cost
· Simple & stable V/ System maximize Plant operation
· Shorten Process cycle
· Maximize Product quality
· Small installation space & Cost
· Internal Anti-corrosion coating with Teflon
· Production cost reduction with above advantages
|
|
|
|
 |
·Dehydration or Alcohol removal from DOP
|
 |
· Remove moisture, gas, and alcohol residue from reactor
|
 |
· Require large amount of water for sealing
· All sealing water become waste water
· Waste water treatment problem
· Require a lot of utility cost (Sealing water & WWT)
· Big water pollution problem
|
|
|
|
 |
·Electrode Drying in LiPB Manufacturing
|
 |
· To remove impurities of electrode
- Water, Solvent(NMP) & Etc.
|
 |
· Low Operation & Utility cost (Oil & Etc.)
· Eliminate oil treatment Problem
· Simple & stable Vacuum System
· Shorten Process cycle
· Maximize Product quality
· Small installation space
· Production cost reduction with above advantages |
|
|
|
 |
·PECVD (Deposition on Al Plate with Ti & Co)
|
 |
· To increase a Hydrophile property on the cooling fin of air conditioners
|
 |
1) Substrate : Al Plate(0.1T)
2) Initial Pressure : 1 x 10-3 Torr
3) Operating Pressure : 1.5 x 10-2 Torr
4) THF injection(3cc/min.) during Ti & Co deposition
5) 6ea-Vacuum system per 1 Line
- Mech. Booster + Oil Rotary Pump : 3ea-2,600㎥/hr
- Oil Rotary Pump only : 3ea-210㎥/hr
|
|
|
|
 |
·Air & N2 mixture
|
 |
· To extract Air, Methane & N2 mixture from isolation box of LNG carrier
|
 |
· Low Operation & Utility Cost(Oil & etc.)
· Eliminate Oil treatment Problem(Eco-Friendly)
· Simple & Stable Vacuum System
· Optimized Pumping Speed
|
|
|
|
 |
·Desmear(PCB) & Laser Drilling(PCB)
·Cleaning(Semiconductor)
|
 |
· Desmear:Surface Etching
· Laser Drilling:Pick & Place Chucking
· Cleaning:Removing Oxidation Layer
|
 |
· Low Operation & Utility Cost(Oil & etc.)
· Eliminate Oil treatment Problem
· Simple & Stable Vacuum System
· Maximize Product Quality
|
|
| |